Asbestos surveys ·
Planning a renovation? Start with the areas you’ll disturb
What to tell your asbestos surveyor before a renovation and how to read the boundaries of a targeted asbestos survey.
Start with the work, not the room name.
A kitchen renovation can involve flooring, splashbacks, electrical routes and wall linings. A bathroom upgrade may reach behind finishes. Tell your surveyor which parts will be removed, opened or changed. That gives them a better starting point than asking for a check of the kitchen or bathroom alone.
Bring the information you already have.
An existing asbestos register, plans and a contractor’s scope can help the surveyor see what has already been checked and what the new work will disturb. Have photos already? Share them without disturbing the material. Leave any inspection or sampling to a competent person.
Read the boundaries before work starts.
Ask what the survey covered, what could not be accessed and what the findings mean for the planned work. A targeted survey is scoped to agreed areas. If the project expands, check whether more assessment is needed before disturbing areas outside that scope.
Further reading: WorkSafe New Zealand: Conducting asbestos surveys.
If you want to discuss a site or a sample, tell us what decision the work needs to support.
